1. Dover-specific tax handling
- State sales tax: 0%. Local jurisdictions in Dover may add their own rate β verify with your local tax assessor.
- Late fees: DE statute Del. Code tit. 6, Β§2301 caps interest on unpaid invoices at 1.5% per month.
2. Standard civil / mechanical / electrical engineer (pe) line items
- Project fee β billed by flat.
- Hourly engineering β billed by hour (~$175 default).
- PE stamp & sealing β billed by flat.
- Site visit β billed by flat.
3. Payment terms that work in Dover
Net 30 is standard for civil / mechanical / electrical engineer (pe)s. Most civil / mechanical / electrical engineer (pe)s in competitive markets like Dover require a 25% deposit upfront before scheduling work. Accept card and ACH on the invoice itself β Dover customers expect a one-click payment link in their inbox.
4. Licensing & disclosures
PE license required to stamp drawings or sign engineering opinions. Discipline-specific rules apply.
Metro
Dover
State
DE
Net terms
30 days
Deposit
25%